Water Supply Project Turbidity Amendment
6 Documents in Project
Summary
SCH Number
2012032029
Lead Agency
California Department of Public Health
(CDPH)
Document Title
Water Supply Project Turbidity Amendment
Document Type
NOD - Notice of Determination
Received
Posted
4/17/2014
Present Land Use
Residential, Open Space, Industrial, Residential, Ag-Forest, Multi-Family, Resource, Commercial
Document Description
LCSD proposes to relocate its infiltration gallery (formerly owned and operated by the Lewiston Valley Water Company) to a location ~2,800 feet downstream of the existing intake in Lewiston, California. The proposed infiltration gallery would be constructed in a large gravel bar built in August 2008 as part of the United States Bureau of Reclamation's Trinity River Restoration Program. On December 20, 2013, the State Water Resources Control Board (State Water Board) issued a water quality certification for the Lewiston Community Services District's Water Supply Project (Project). Condition 4 of this water quality certification outlined the turbidity thresholds that must be met during Project construction. Shortly after the issuance of this water quality certification, State Water Board staff was contacted by the Project Applicant regarding its ability to meet the constraints of Condition 4 be replaced with a term similar to what was required for the Trinity River Restoration Program. The water quality certification amendment involves the replacement of Condition 4 with updated turbidity requirements.
Contact Information
Name
Peter Barnes
Agency Name
SWRCB, Division of Water Rights
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Trinity
Cross Streets
Deadwood Road/Turnpike Road
Zip
96052
Total Acres
6.66
Parcel #
Multiple
State Highways
Hwy 3
Schools
Lewiston ES
Waterways
Trinity River
Township
33N
Range
8W
Section
17,18
Base
MDB&M
Other Location Info
City/Nearest Community: Lewiston
Other Information
Cont. Section: 26
Notice of Determination
Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.