Penn Valley Wastewater Forcemain

2 Documents in Project

Summary

SCH Number
2012032020
Lead Agency
Nevada County
Document Title
Penn Valley Wastewater Forcemain
Document Type
NOD - Notice of Determination
Received
Posted
6/8/2012
Present Land Use
Project is located within existing County roadway right-of-way
Document Description
The purpose of the project is to decommission the existing PV-WWTF and to transport wastewater flows from the Penn Valley service are to the LWW-WWTF. The force main will consist of two approximately 6-inch diameter pipes installed a joint trench. The pipes will be installed at a depth of approximately three to four feet on average. Deeper or shallower installation may be may be required to accommodate existing drainage culverts and other utilities. The proposed sewer force main alignment would be located completely within the existing road right-of-way and utility easements. Generally, the force main would be located in the paved roadway or along the gravel shoulder. This location will minimize effects on adjacent property owners and the natural environment.

Contact Information

Name
David A. Garcia, Jr.
Agency Name
Nevada County Department of Public Works
Contact Types
Lead/Public Agency

Location

Counties
Nevada
Cross Streets
Penn Valley Drive, Spenceville Road, Pleasant Valley Drive, SR 20
Zip
95959
Total Acres
4.5
Parcel #
County right-of-way
State Highways
Hwy 20
Waterways
Squirrel Creek
Township
16N
Range
7E
Section
20-21
Other Location Info
City/Nearest Community: Penn Valley, Lake Wildwood

Notice of Determination

Approving Agency
Nevada County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.