Cole Avenue Storm Drain Project

2 Documents in Project

Summary

SCH Number
2012031070
Lead Agency
Riverside, City of (City of Riverside)
Document Title
Cole Avenue Storm Drain Project
Document Type
NOD - Notice of Determination
Received
Posted
10/22/2012
Present Land Use
Medium Density Residential/R-1-10500/Medium Density Residential

Document Description
The proposed Cole Avenue Storm Drain Project will construct approximately 2,500 linear feet of storm drain improvements between Krameria Avenue to the north and Lurin Avenue to the south, as well as an earthen low flow drainage ditch extending 300 feet south of Lurin Avenue. The proposed storm drains will convey runoff from the surrounding residential developments and discharge to a proposed outlet structure to be located on the south side of Lurin Avenue approximately 400 feet west of Cole Avenue. From there, flows will be directed towards a proposed low-flow earthen drainage ditch that runs southwesterly approximately 300 feet from Lurin Avenue.

Contact Information
Edward Lara
City of Riverside
3900 Main Street, 4th Floor
Riverside, CA 92522

Phone : (951) 826-2337

Location

Coordinates
33°52'35"N 117°19'21"W
Cities
Riverside
Counties
Riverside
Cross Streets
Cole Avenue & Lurin Avenue
Zip
92508
Total Acres
0.5 or less
Parcel #
266-140-006 & road rights-of-way
State Highways
No
Railways
No
Airports
No
Schools
RUSD, WUSD
Waterways
No
Township
35
Range
4W
Section
29
Base
SBB&M

Notice of Determination

Approving Agency
City of Riverside
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
City of Riverside, Public Works Department, 3900 Main Street, Riverside

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search