Stream Alteration Agreement No. 1600-2011-0072-R4 for the Mammoth Pool Howell-Bunger Valve and Fishwater Generator Replacement Project

4 Documents in Project

Summary

SCH Number
2012031068
Lead Agency
Fish & Game #4
Document Title
Stream Alteration Agreement No. 1600-2011-0072-R4 for the Mammoth Pool Howell-Bunger Valve and Fishwater Generator Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/10/2012
Present Land Use
Open Space

Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement, pursuant to Section 1602 of the Fish and Game Code, for the Mammoth Pool Howell-Bunger Valve and Fishwater Generator Replacement Project. The Project includes the modification and replacement of existing water release systems at the Mammoth Pool Dam to allow increased minimum instream flows (MIFs) to benefit downstream aquatic and riparian resources as required by the Federal Energy Regulatory Commission for re-licensing (Project No. 2085).

Contact Information
Matthew Cohen
California Department of Fish and Game
Lead/Public Agency
1234 E. Shaw Avenue
Fresno, CA 93710

Phone : 559 243 4014 x232

Location

Coordinates
37°19'16.3"N 119°19'17"W
Counties
Madera
Waterways
Mammoth Pool Reservoir, San Joaquin River
Township
7S
Range
24E
Section
14
Base
MDB&M
Other Location Info
Shaver Lake

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
The California Department of Fish and Game 1234 East Shaw Avenue, Fresno, California 93710

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print