OXY USA Inc. Dominguez Oil Field Development Project
2 Documents in Project
Summary
SCH Number
2012031019
Lead Agency
City of Carson
Document Title
OXY USA Inc. Dominguez Oil Field Development Project
Document Type
EIR - Draft EIR
Received
Present Land Use
OXY USA Inc. Dominguez Oil Field Development Project
Document Description
OXY proposes to construct a production facility consisting of up to 200 wells, an oil and gas processing facility, water treatment, water injection operations, slurry injection or disposal operations, an electrical substation, emergency flare, and shipping and pipeline facilities to produce and transport ~6,000 barrels per day of oil and 3 million standard cubic feet per day of natural gas. Directional drilling techniques will be used in order to pinpoint oil reservoirs at depths of 4,000 to 13,500 feet. The Facility will be located in a 30-foot high walled compound with the drill rig mast enclosed.
Contact Information
Name
Saied Naaseh
Agency Name
City of Carson
Contact Types
Lead/Public Agency
Phone
Location
Cities
Carson
Counties
Los Angeles
Cross Streets
Charles Willard Street and Bishop Avenue
Zip
90746
Total Acres
+6.5
State Highways
Hwy 91
Airports
Compton
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 7 (DOT), California Energy Commission, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Department of Water Resources, Office of Emergency Services, California, Resources Agency, California Native American Heritage Commission (NAHC)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC)
Development Types
Industrial (Acres 6.5, Employees 15)
Local Actions
Specific Plan
Project Issues
Air Quality, Drainage/Absorption, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Transportation
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.