California Highway Patrol Communication Facilities Replacement Project, Rodman Mountain

Summary

SCH Number
2012028138
Public Agency
California Highway Patrol (CHP)
Document Title
California Highway Patrol Communication Facilities Replacement Project, Rodman Mountain
Document Type
NOE - Notice of Exemption
Received
Posted
2/7/2012
Document Description
CHP is proposing to replace the Rodman Mountain telecommunications facility to meet the CHP Enhanced Radio System requirements. The existing leased vault and tower space is inadequate and facilities antiquated to accommodate the digital multi-channel equipment and antennae requirements. The project consists of installing a 120-foot tower, vault, propane tank, and generator. Preparations at the existing leveled site include clearing of for concrete slabs, and minor trenching for propane pipeline and conduits of wires to the tower. After the utilities are installed, all trenches we backfilled and restored to grade. Less than one acre of ground disturbance is required.

Contact Information

Name
Daniel O'Brien
Agency Name
California Highway Patrol
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 2, Sec. 15302
Reasons for Exemption
Field review confirms that no exceptions apply which would preclude the use of a NOE for this project. The State has concluded that no significant environmental impact would occur to aesthetics, agriculture and forestland/timberland, air quality, biological resources, cultural resources, geology and soils, greenhouse gas emissions, hazards and hazardous materials, hydrology and water quality, land use planning, mineral resources noise, population and housing, public services, recreation, transportation/traffic, or to utilities and service systems. Documentation of the environmental review is kept on file at 707 Third Street, West Sacramento, CA 95605. This project fits under Class 2 of Categorical Exemptions to CEQA which allows replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site and will have substantially the same purpose and capacity as the structure replaced.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print