West of Hills Northern Pipelines Project
8 Documents in Project
Summary
SCH Number
2012022068
Lead Agency
East Bay Municipal Utility District
(EBMUD)
Document Title
West of Hills Northern Pipelines Project
Document Type
ADM - Addendum
Received
Present Land Use
Primarily developed within existing streets; also Open Space/Parks/Recreation, and Multi-Family Res/Med. Density Residential.
Document Description
The project involves the construction and operation of four transmission pipeline segments in western Alameda and Contra Costa Counties - a proposed 1.5 mile long, 48-inch diameter pipeline in the City of Berkeley; a proposed 36-inch diameter, 2.5 mile long pipeline in the City of El Cerrito; a proposed 36-inch diameter, 2.5 mile long pipeline in the Cities of El Cerrito and Richmond; and a proposed 36-diameter, 1.9 mile long pipeline in the Cities of Richmond and San Pablo. The proposed pipeline routes are located within existing city streets and on non-street properties owned by EBMUD ans City of San Pablo.
Contact Information
Name
Timothy McGowan
Agency Name
East Bay Municipal Utility District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Berkeley, Brentwood, El Cerrito, Richmond, San Pablo
Counties
Alameda
State Highways
123
Railways
BART, SP
Waterways
San Francisco Bay
Notice of Completion
Development Types
Water Facilities (Type Pipelines)
Project Issues
Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Vegetation, Wetland/Riparian
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.