West of Hills Northern Pipelines Project
8 Documents in Project
Summary
SCH Number
2012022068
Lead Agency
East Bay Municipal Utility District
(EBMUD)
Document Title
West of Hills Northern Pipelines Project
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2013
Present Land Use
Primarily developed within existing streets; also Open Space/Parks/Recreation, and Multi-Family Res/Med. Density Residential.
Document Description
The project involves the construction and operation of four transmission pipeline segments in western Alameda and Contra Costa Counties - a proposed 1.5 mile long, 48-inch diameter pipeline in the City of Berkeley; a proposed 36-inch diameter, 2.5 mile long pipeline in the City of El Cerrito; a proposed 36-inch diameter, 2.5 mile long pipeline in the Cities of El Cerrito and Richmond; and a proposed 36-diameter, 1.9 mile long pipeline in the Cities of Richmond and San Pablo. The proposed pipeline routes are located within existing city streets and on non-street properties owned by EBMUD ans City of San Pablo.
Contact Information
Name
Timothy McGowan
Agency Name
East Bay Municipal Utility District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Brentwood, El Cerrito, Richmond, San Pablo
Counties
Alpine, Contra Costa
State Highways
123
Railways
BART, SP
Waterways
San Francisco Bay
Notice of Determination
Approving Agency
East Bay Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.