Canyonero 2R Roadway Rehabilitation and Temporary Hot Mix Asphalt Plant Project

2 Documents in Project

Summary

SCH Number
2012022036
Lead Agency
California Department of Transportation, District 2
Document Title
Canyonero 2R Roadway Rehabilitation and Temporary Hot Mix Asphalt Plant Project
Document Type
NOD - Notice of Determination
Received
Posted
4/3/2012
Present Land Use
Highway
Document Description
The project includes an asphalt concrete overlay, installation and operation of a temporary hot mix asphalt (HMA) plant within the highway right-of-way, grinding and digging-out existing pavement, cracking and seating existing Portland cement concrete pavement, replacement of bridge joint seals, rehabilitation of bridge decks and adjustment or replacement of bridge approach slabs, construction of asphalt concrete dike to facilitate storm water drainage, placing new shoulder backing, new pavement delineators/painting, adjusting and upgrading metal beam guardrail, adjusting drainage inlets, adding new signs and upgrading existing traffic signs, installation of overhead sign structures, miscellaneous construction staging and stockpiling operations, upgrading and installing new closed-circuit TV cameras, installing highway advisory radios and roadway weather information systems, and repairing an embankment slip-out at post mile 50.5 adjacent to the southbound traffic lanes.

Contact Information

Name
Chris Quiney
Agency Name
California Department of Transportation, District 2
Contact Types
Lead/Public Agency

Location

Counties
Shasta
Parcel #
various
State Highways
I-5
Railways
UPRR
Waterways
Sacramento River
Other Location Info
City/Nearest Community: Delta

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.