Widening of Hammer Ave. from 1,500 feet South of, to 2,150 feet north of Citrus Avenue

3 Documents in Project

Summary

SCH Number
2012021050
Lead Agency
Norco, City of (City of Norco)
Document Title
Widening of Hammer Ave. from 1,500 feet South of, to 2,150 feet north of Citrus Avenue
Document Type
NOD - Notice of Determination
Received

Document Description
CDFG is executing a Streambed Alteration Agreement (SAA # 1600-2012-0002-R6 pursuant to Section 1602 of the Fish and Game Code to the project Applicant: City of Norco, represented by Steve King, 2870 Clark Avenue Norco, CA 92860. The Project is limited to the widening of Hammer Avenue in accordance with the adopted Circulation Element of the General Plan, from 1,500-feet south of, to 2,150-feet north of Citrus Avenue within the 110-foot right-of-way. The project will include: reconstruction of driveways; landscaping; curb and gutter reconfiguration; traffic signal way. The project will include: reconstruction of driveways; landscaping; curb and gutter reconfiguration: traffic signal improvements; storm drain improvements; the construction of concrete retaining walls; relocation of a 20-inch domestic water line; construction of a causeway; and the installation of a 30-inch water line and related appurtenances. The project also includes the construction of two detention basins immediately west of one the existing unnamed drainage.

Contact Information
Juan Lopez Torres
California Department of Fish and Game
Inland Deserts Region 6 4665 Lampson Avenue, Suite J
Los Alamitos, CA 90720

562 430 7212
562 799 8427

Location

Cities
Norco
Counties
Riverside
Cross Streets
Hamner Avenue and Citrus Street
Zip
92860
State Highways
I-15
Waterways
Santa Ana River
Township
2S
Range
7W
Section
31/36

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
4665 Lampson Avenue, Suite J, Los Alamitos, CA 90720

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes