Proposed Habitat Enhancement and Fire Protection Project on the Canebrake Ecological Reserve, Kern Co. CA

2 Documents in Project

Summary

SCH Number
2012021044
Lead Agency
Fish & Game #4
Document Title
Proposed Habitat Enhancement and Fire Protection Project on the Canebrake Ecological Reserve, Kern Co. CA
Document Type
NOD - Notice of Determination
Received
Posted
12/23/2013
Present Land Use
Department of Fish and Game Ecological Reserve
Document Description
The Department proposes to employ habitat enhancement activities and fire protection measures to improve habitat for wildlife species and reduce or eliminate potential catastrophic effects to surface values of the Canebrake Ecological Reserve (CBER) and adjacent private properties from a wildfire event. The project will involve conducting a controlled burn, implementing limited livestock grazing, collecting data, and constructing a pond within the 800-acre Sprague Ranch Unit of the CBER, plus constructing firebreaks in strategic areas along the CBER perimeter to protect adjacent properties.

Contact Information

Name
Krista Tomlinson
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Kern
Cross Streets
Hwy 178
Zip
93255
Total Acres
7195
Parcel #
refer to attached table for locations
State Highways
Hwy 178
Schools
South Fork ES
Waterways
South Fork Kern River
Other Location Info
City/Nearest Community: Weldon

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print