Homewood Water Quality Improvement Project Phase 1 and Phase 1A
3 Documents in Project
Summary
SCH Number
2012012038
Lead Agency
Placer County
Document Title
Homewood Water Quality Improvement Project Phase 1 and Phase 1A
Document Type
NOD - Notice of Determination
Received
Posted
3/6/2012
Present Land Use
Single and multi family; commercial; recreational; TRPA Regional Plan for the Lake Tahoe Basin
Document Description
The purpose of the Homewood Water Quality Improvement Project is to reduce erosion and improve the quality of stormwater discharged from the County rights-of-way to reduce the amount of sediment discharged into Lake Tahoe. The project will assist the County in regulatory compliance for the Lake Tahoe Total Maximum Daily Load. The project design includes low impact development concepts and incorporates adjacent agency improvements for comingled flows. The project will have direct benefit to the quality of nearby waterways, Lake Tahoe, as well as benefits to the natural environment. This project is part of the Tahoe Regional Planning Agency (TRPA) EIP Project No. 725.
Contact Information
Name
Marla Holveck
Agency Name
Placer County Department of Public Works - Tahoe Engineering Div
Contact Types
Lead/Public Agency
Phone
Location
Counties
Placer
Cross Streets
Simplon Pass Road; Interlaken Road; Cherry Street; Sacramento Avenue; Silver Street
Parcel #
multiple
State Highways
SR 89
Waterways
Lake Tahoe
Township
15N
Range
16E
Section
1
Other Location Info
Homewood
Notice of Determination
Approving Agency
Placer County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.