Implementation of Pond Management Plan
4 Documents in Project
Summary
SCH Number
2012012026
Lead Agency
Midpeninsula Regional Open Space District
Document Title
Implementation of Pond Management Plan
Document Type
NOD - Notice of Determination
Received
Posted
6/13/2012
Present Land Use
Resource Management
Document Description
The Project entails the repair and maintenance of ponds DR07 and DR08 on the La Honda Creek Open Space Preserve to improve habitat for California red-legged frog (CRLF) and other sensitive species in the area and to reduce the sediment load into the San Gregorio watershed. Activities include re-contouring the land to restore depths of existing ponds, repairing existing embankments and failing berms, improving bench areas and existing spillways, redirecting cattle access through the installation of fencing and alternate water sources such as water troughs, and removing invasive and non-native vegetation. Minor road improvements will also be conducted including minor re-grading, installation of water bars, rolling dips and vegetation buffers. Disturbed areas will be reseeded and native plant species and pasture grasses consistent with those in the surrounding area. The Department of Fish and Game (DFG) is executing a Lake and Streambed Alteration Agreement, Number 1600-2012-0030-R3, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Midpeninsula Regional Open Space District as represented by Julie Andersen.
Contact Information
Name
Suzanne DeLeon
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Mateo
Cross Streets
Sears Ranch Road west of Hwy 84
Zip
94020
Total Acres
11
Parcel #
078-270-030 & 078-270-010
State Highways
Hwy 84
Railways
No
Airports
No
Schools
La Honda ES
Waterways
Harrigton and Bogess Creeks
Township
7S
Range
4W
Section
3-4, 9
Base
MDB&M
Other Location Info
City/Nearest Community: La Honda
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.