El Camino Real at Santa Margarita Creek Bridge Scour Project, 245R12B585; Agreement 1600-2012-0044-R4
3 Documents in Project
Summary
SCH Number
2012011014
Lead Agency
San Luis Obispo County
Document Title
El Camino Real at Santa Margarita Creek Bridge Scour Project, 245R12B585; Agreement 1600-2012-0044-R4
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2012
Present Land Use
Residential Suburban
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, Mr. Dave Flynn. The Project consists of reinforcing the El Camino Real at Santa Margarita Creek Bridge (No. 493C0310) to repair scour at bridge foundations. The Project will include dowels being drilled and cemented at various locations along the bottoms of piers No. 2 and No. 3 in the area of the existing scour cavities. Approximately 31 cubic yards of loose sediment and soft, weathered sandstone will be removed in preparation for reinforcement of the cavities. Four-sack grout will be pumped into the cavities to replace the scoured-out sandstone bedrock and prevent further undermining of the structure. If work occurs while surface flows exist in the channel, a dewatering plan will be implemented to divert flows around the work area. The Notification materials, including engineered plans, are made part of the Project Description. An access ramp will be created to allow the equipment to reach the scour area from Santa Margarita Road to the northwest of the Project Area.
Contact Information
Name
Robb Tibstra
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Atascadero
Counties
San Luis Obispo
Cross Streets
El Camino Real and Asuncion Road
Zip
93422
Total Acres
0.05
Parcel #
090-051-030
Schools
Atascadero USD
Waterways
Santa Margarita Creek
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes