Ocean Outlet Maintenance Manual
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2012011009
- Lead Agency
- Orange County Flood Control District
- Document Title
- Ocean Outlet Maintenance Manual
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/26/2018
- Present Land Use
- Ocean outlets of Santa Ana River and 5 drainage channels/storm drains; various; various
- Document Description
- The Project will maintain channel outlet capacity at five specified ocean outlets for purposes of flood control, water quality, bech access, and tidal wetland maintenance. The five outlet sites are: Talbert Channel, Santa Ana River, Salt Creek, Estrella outlet, and Segunda Deshecha. All sites are in or adjacent to the tidal zone. Three of the sites (Talbert, Santa Ana River, and Salt Creek) are also within the freshwater Ordinary High Water Mark. Maintenance involves sand removal at all sites and re-setting displaced rock rip-rap at one site.
- Contact Information
-
Cliff Harvey
State Water Resources Control Board, DWQ
Lead/Public Agency
1001 I Street, 15th Floor
Sacramento, CA 95814
Phone : (916) 558-1709
Location
- Coordinates
- 33°25'54"N 33°37'53"W
- Cities
- Huntington Beach San Clemente
- Counties
- Orange
- Cross Streets
- Six Locations
- Zip
- Varies
- Total Acres
- 21.674
- Parcel #
- Not applicable
- State Highways
- I-5, SR 1
- Railways
- OCTA/Metrolink
- Airports
- No
- Schools
- Numerous
- Waterways
- Pacific Ocean; Santa Ana River; 5 storm drains
- Township
- varies
- Range
- varies
- Section
- varies
Notice of Determination
- Approving Agency
- State Water Resources Control Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 300 N Flower Street, Santa Ana, CA 92703
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.