Ocean Outlet Maintenance Manual

6 Documents in Project

Summary

SCH Number
2012011009
Lead Agency
Orange County Flood Control District
Document Title
Ocean Outlet Maintenance Manual
Document Type
NOD - Notice of Determination
Received
Posted
10/25/2012
Present Land Use
Ocean outlets of Santa Ana River and 5 drainage channels/storm drains; various; various
Document Description
Orange County DPW will perform routine maintenance on six drainage outlets which deliver stream and storm water runoff to the Pacific Ocean in Orange County. These outlets are routinely blocked by sand during winter storms, creating seasonal lagoons that are subject to oxygen depletion in the summer. This in turn causes biological impacts, including fish kills. The maintenance program maintains the drainage outlets in order to prevent these conditions. Maintenance involves sand removal at all the site and re-setting displaced rock rip-rap at one site.

Contact Information

Name
Cliff Harvey
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Huntington Beach, San Clemente
Counties
Orange
Cross Streets
Six Locations
Zip
Varies
Total Acres
21.674
Parcel #
Not applicable
State Highways
I-5, SR 1
Railways
OCTA/Metrolink
Airports
No
Schools
Numerous
Waterways
Pacific Ocean; Santa Ana River; 5 storm drains
Township
varies
Range
varies
Section
varies

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print