Archer Forward: Campus Preservation and Improvement Plan

5 Documents in Project

Summary

SCH Number
2012011001
Lead Agency
City of Los Angeles
Document Title
Archer Forward: Campus Preservation and Improvement Plan
Document Type
NOD - Notice of Determination
Received
Posted
8/11/2015
Present Land Use
Private school serving grades 6-12 / Z: RE11-1 & R3-1 / Very Low II Residential, Medium Residential
Document Description
The project proposes improvements to the existing Archer campus totaling 60,271 sf of new development, including the replacement of the existing 30,071 sf North Wing of the Main Building with a 30,400 sf renovated North Wing, and the development of an approximately 39,330 sf of Multipurpose Facility, a 17,758 sf Performing Arts Center, and a 7,400 sf Visual Arts Center. The existing outdoor athletic field would be improved to include a regulation size soccer and softball field. Parking would be provided in a new underground parking structure located below the athletic field to accommodate 164 parking spaces, expandable to 251 parking spaces with the use of an attendant. The two adjacent properties currently owned by Archer, 11728 West Chaparal Street and 141 North Barrington Avenue, would be removed to accommodate the project. A portion of 141 North Barrington Avenue, referred to as the Residential Portion of the Barrington Parcel, would remain a residential use in accordance with section 12.07.01 of the Los Angeles Municipal Code. At full build out, the campus' total development would be 148,995 sf, and 75 percent of the campus would be open space.

Contact Information

Name
Elva Nuno-O'Donnell
Agency Name
City of Los Angeles
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Sunset Boulevard and Barrington Avenue
Zip
90049
Total Acres
7.31
Parcel #
4402009-013/ 014/ 016/ 002/ 003
State Highways
I-405
Schools
Several
Other Location Info
Brentwood-Pacific Palisades

Notice of Determination

Approving Agency
City of Los Angeles
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print