Water Right Change Petition for the Phase 2 Seaside Groundwater Basin Aquifer Storage and Recovery (ASR) Project

Summary

SCH Number
2011128019
Public Agency
State Water Resources Control Board
Document Title
Water Right Change Petition for the Phase 2 Seaside Groundwater Basin Aquifer Storage and Recovery (ASR) Project
Document Type
NOE - Notice of Exemption
Received
Posted
12/2/2011
Document Description
The project is to change water right Permit 20808B of Monterey Peninsula Water Management District (MPWMD) to facilitate the ASR Phase 2 project, a joint project with Cal Am. Up to 2,900 acre-feet of Carmel River winter flow will be diverted, treated to drinking water standards, then groundwater banked in the Seaside Basin via the existing Cal Am water distribution system. Aquifer storage and recovery wells were installed as part of ASR Phase 1. Water will be recovered after the rainy season and pumped into the existing Cal AM distribution system for municipal use.

Contact Information

Name
Katherine Mrowka
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Seaside
Counties
Monterey

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
The project will not increate existing diversions by Cal Am from the Carmel River. Existing diversion facilities include the Cal Am water production, treatment and distribution system for the Monterey Peninsula area, and aquifer storage and recovery wells.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print