Lease Agreement For Subsurface Utility Trenches And Air Rights for Pedestrian Bridges

4 Documents in Project

Summary

SCH Number
2011122065
Lead Agency
University of California
Document Title
Lease Agreement For Subsurface Utility Trenches And Air Rights for Pedestrian Bridges
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2012
Present Land Use
Land that is part of the Mission Bay South Plan of the Mission Bay Redevelopment Area. The project site is partially on land controlled by the University of California and is part of the UCSF Medical Center at Mission Bay, a project that has been approved by the UC Regents. The majority of the site is presently on land designated for a street right-of-way. The project would involve an encroachment permit for the proposed plaza and an air rights lease for future bridges. As the site would remain a public street right-of-way, the project would be consistent with the Mission Bay South Plan.
Document Description
Lease between The Regents of the University of California, as Lessee, and the City and County of San Francisco (City), as Lessor, for two underground utility trenches and air rights for two pedestrian bridges located under and over Fourth Street, south of 16th Street and north of Mariposa Street, San Francisco, California, for use by the UCSF Medical Center at Mission Bay. Lease is required for hospital operations (utility connections beneath Fourth Street) and impatient movement between hospitals (pedestrian bridges above Fourth Street).

Contact Information

Name
Diane Wong
Agency Name
University of California
Contact Types
Lead/Public Agency

Location

Cities
San Francisco
Counties
San Francisco
Cross Streets
Btwn 16th Street and Mariposa Street
Zip
94107
Total Acres
~2
State Highways
US 101, I-80, I-280
Railways
Caltrain
Airports
No
Schools
Several
Waterways
San Francisco Bay, Mission Creek, Islais Creek

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print