CP#11-91/Project No. 0662-6R4101
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2011122056
- Lead Agency
- Contra Costa County
- Document Title
- CP#11-91/Project No. 0662-6R4101
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/22/2012
- Present Land Use
- GP: Public/Semi-Public; Z: Arterial Roadway
- Document Description
- This proposed project involves safety improvements to an existing roadway that will include tree and vegetation removal, excavation of a hillside, grubbing and grading, road construction, and other activities within a 6.5-acre footprint. The project will realign the road to reduce the number of curves, widen the existing travel lanes to 12 feet each, and add up to 5-foot wide paved shoulders. The project will require cutting into the existing hillside slope along the north side of the road to accommodate the road realignment. The hillside will be cut at a 2:1 slope which requires cutting into the base of the slope and removing between 1,500 and 4,000 cubic yards of soil from the face of the hillside.
- Contact Information
-
Randi Adair
Department of Fish and Game (DFG)
Lead/Public Agency
Bay Delta Region 7329 Silverado Trail,
Napa, CA 94558
Phone : (707) 944-5596
Location
- Coordinates
- 37°57'52.34"N 122°11'46.69"W
- Cities
- Martinez
- Counties
- Contra Costa
- Cross Streets
- Bear Creek Road
- Zip
- 94553
- Total Acres
- 10
- Parcel #
- N/A; Adjoined by multiple parcels
- Waterways
- Pinole Creek
- Township
- 1N
- Range
- 3W
- Base
- MDB&M
Notice of Determination
- Approving Agency
- DFG
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Department of Fish and Game (DFG) Bay Delta Region 7329 Silverado Trail, Napa, CA 94558
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.