Demonstration of a Pre-Commercial, Electrified Thermal Reactor with Integrated Lime Hydration for use in Direct Air Capture
4 Documents in Project
Summary
SCH Number
2011122004
Lead Agency
City of Tracy
Document Title
Demonstration of a Pre-Commercial, Electrified Thermal Reactor with Integrated Lime Hydration for use in Direct Air Capture
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2025
Document Description
CEC Grant with Heirloom Carbon Technologies (EPC-24-021) for the design and build-out of a pre-commercial electric reactor (calciner) and tower with an in-line hydration system that will be integrated with an operational direct air capture facility in Tracy. This project will be built at the Tracy Desalination and Green Energy Project site.
Contact Information
Name
Maryam Haddad
Agency Name
California Energy Commission
Job Title
Air Pollution/Carbon Capture Specialist
Contact Types
Responsible Agency
Phone
Name
Bill Carlson
Agency Name
City of Tracy
Job Title
Planning Manager, City of Tracy
Contact Types
Lead/Public Agency
Phone
Name
Priya Patel
Agency Name
Heirloom Carbon Technologies, Inc.
Job Title
Technical Program Manager
Contact Types
Project Applicant
Phone
Email
Location
Coordinates
Cities
Tracy
Counties
San Joaquin
Regions
Citywide
Cross Streets
West Sugar Road and Arbor Avenue
Zip
95304
Other Location Info
4750 S. Holly Drive, Tracy, CA 95304, San Joaquin County
Notice of Determination
Approving Agency
California Energy Commission
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
California Energy Commission, 715 P Street, Sacramento, CA 95814
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.