Chevron U.S.A. Inc. Lost Hills Steam Pilot Project (Project S-1092524)

2 Documents in Project

Summary

SCH Number
2011121088
Lead Agency
San Joaquin Valley Air Pollution Control District
Document Title
Chevron U.S.A. Inc. Lost Hills Steam Pilot Project (Project S-1092524)
Document Type
NOD - Notice of Determination
Received
Posted
3/5/2012
Present Land Use
Oil field/Exclusive Agriculture/Intensive Agriculture and Mineral and Petroleum
Document Description
Chevron proposes to install and operate eleven (11) new steam generators and supporting water treatment facilities within their current operations in the Lost Hills Oil Field. The proposal includes ten (10) natural gas-fired 85.0 MMBtu/hr and one (1) 62.5 MMBtu/hr steam generators equipped with North American GLE low-NOx burner assemblies (or equivalent) capable of acheieving NOx emissions of 7 ppmvd @ 3% O2 and flue gas recirculation (FGR). As the units are built out, water softening facilities will be constructed to keep pace with the increase demand for soft water that each steam generator requires.

Contact Information

Name
Jessica Willis
Agency Name
San Joaquin Valley Unified Air Pollution Control District
Contact Types
Lead/Public Agency

Location

Counties
Kern
State Highways
Hwy 46
Waterways
California Aqueduct
Township
26S
Range
21E
Section
29,33
Base
MDB&M
Other Location Info
City/Nearest Community: Lost Hills

Notice of Determination

Approving Agency
San Joaquin Valley Unified Air Pollution Control District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print