Templeton Road Widening Project; 300386
3 Documents in Project
Summary
SCH Number
2011121059
Lead Agency
San Luis Obispo County
Document Title
Templeton Road Widening Project; 300386
Document Type
NOD - Notice of Determination
Received
Posted
1/27/2012
Present Land Use
Agricultural uses, single family residences / Residential Rural and Agriculture
Document Description
Construct improvements to Templeton Road between South El Pomar Road and Bluebird Hill Lane including: widen Templeton Road to two 12-foot travel lanes with 4-foot paved shoulders, and improve drainage. The Project also includes realigning a jurisdictional roadside drainage ditch. The Project's goal is to improve safety by allowing for more recovery room for vehicles along Templeton Road. Most of the work will be conducted within the County right of way; however, 8 adjacent parcels will be subject to disturbance. The Project is anticipated to result in approximately 3.9 acres of total disturbance.
Contact Information
Name
Eric Wier
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Luis Obispo
Cross Streets
Templeton Road & South El Pomar Road
Zip
93465
Total Acres
3.9
Parcel #
Road R-O-W & several parcels
State Highways
Hwy 41 & 101
Railways
UPRR
Airports
No
Schools
No
Waterways
Salinas River
Township
27S
Range
12E
Base
MDB&M
Other Location Info
City/Nearest Community: Templeton
Notice of Determination
Approving Agency
San Luis Obispo County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.