Roosevelt Elementary School New Construction Project

3 Documents in Project

Summary

SCH Number
2011121058
Lead Agency
Long Beach Unified School District
Document Title
Roosevelt Elementary School New Construction Project
Document Type
NOD - Notice of Determination
Received
Posted
5/2/2012
Present Land Use
Elementary School/Institutional/Institutional
Document Description
Temporary relocation of the Roosevelt student population and inter-school bus transfer station during construction, removal of portable classroom buildings, relocation of two sewer lines into adjacent streets, demolition of onsite buildings and infrastructure, construction of new buildings and infrastructure, relocation of students and bus transfer station back to the new campus. Total new building square footage is about 110,000 sf. New facilities would house the current student population from K to 5th grade, with administration, 48 classrooms, library/media center, visual arts/music rooms, technology/computer center, multi-purpose room, food services and parking structure.

Contact Information

Name
Carri Matsumoto
Agency Name
Long Beach Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles
Cross Streets
Linden Avenue/16th Street
Zip
90810
Total Acres
4.6
Parcel #
7269-031-900;7269-032-900
State Highways
CA Hwy 1
Schools
Polytechnic HS

Notice of Determination

Approving Agency
Long Beach Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.