Solar Gen 2-Arkansas Solar Energy Project, Young Road Crossing

3 Documents in Project

Summary

SCH Number
2011121011
Lead Agency
Imperial County
Document Title
Solar Gen 2-Arkansas Solar Energy Project, Young Road Crossing
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW is executing a Lake and Streambed Alteration Agreement (SAA # 1600-2014-0083-R6) pursuant to Section 1602 of the Fish and Game Code to the project Applicant, SG2 Imperial Valley LLC, represented by Mr. Brian Kunz 135 Main Street, 6th Floor, City of San Francisco, State of California, 94105, Phone 415-925-2000. The Applicant is proposing to improve (widen and pave) the Young Road site access driveway and also replace and extend underlying agricultural drainage infrastructure in order to improve access to the Solar Gen 2-Arkansas Solar Energy Project. The project will consist of the widening/paving of the site access driveway, removal of existing drainage culvert pipes, replacing and extending the drainage culvert pipes with 48-inch Class III reinforced concrete pipes and the construction of two (one inlet and one outlet) headwall/wingwall structures with concrete aprons. A total of 0.22 acres of permanent impacts to jurisdictional streambed and a total of 0.01 acres of temporary impacts to jurisdictional streambed will result from the construction activities.

Contact Information
Charles Land
CDFW Region 6
3602 Inland Empire Boulevard, Suite C-220
Ontario, CA 91764

760-200-9418
909-481-2945

Location

Cities
Calipatria
Counties
Imperial
Cross Streets
Dowden Rd, Titsworth Rd, Williams Rd, Sinclair Road, Lindsey Rd, Batley Rd, Young Rd, Jackson Rd
Zip
92233
Total Acres
2.009
Parcel #
various
State Highways
Hwy 111 & 115
Railways
UPRR
Schools
Mulberry
Waterways
IID Canals/Drains
Township
variou
Range
variou
Section
variou
Base
SBB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
801 Main Street, El Centro, CA 92243

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search