Pumping Plant No. 1B Emergency Diesel Generator

2 Documents in Project

Summary

SCH Number
2011112050
Lead Agency
Reclamation District No. 1000
Document Title
Pumping Plant No. 1B Emergency Diesel Generator
Document Type
NOD - Notice of Determination
Received
Posted
1/19/2012
Present Land Use
Land Use - Flood Protection; Zoning - Agriculture; General Plan - Suburban Center
Document Description
The proposed project includes the construction of a concrete masonry block building addition to the existing Plant 1B electrical building to house an emergency diesel generator. The new building would abut and be located along the northeast wall of the existing electrical building. It would be approximately 16 feet wide by 28 feet long by 20 feet tall. Air intake louvers would be located on the north side of the structure, while the exhaust louvers would be located on the east side of the building, facing away from the existing residences. A 2,500 kilowatt diesel generator would be installed within the new building. The generator will be mounted on vibration dampers to lessen any potential for excessive vibrations or increase ambient noise levels. Likewise, critical grade silencers will be installed on the generator to attenuate the noise of the generator.

Contact Information

Name
Paul Devereux
Agency Name
Reclamation District No. 1000
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Garden Highway
Total Acres
<1
Parcel #
274-0030-053
State Highways
I-5; I-80
Schools
Two Rivers ES, Leroy F Greene MS
Waterways
Sacramento River, American River
Township
9N
Range
4E
Section
27
Base
MDB&M

Notice of Determination

Approving Agency
Reclamation District No. 1000
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.