Water Treatment Plants Rehabilitation Project

4 Documents in Project

Summary

SCH Number
2011112039
Lead Agency
City of Sacramento
Document Title
Water Treatment Plants Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
4/4/2012
Present Land Use
Water Treatment Plants / Light Industrial and Residential / Public Quasi-Public
Document Description
The proposed Water Treatment Plant Rehabilitation project consists of replacing existing outdated equipment and facilities, constructing miscellaneous improvements at SRWTP and constructing solids handling improvements at SRWTP and EAFWTP. The project does not increase the capacity of either the SRWTP or the EAFWTP. Construction of the proposed project will take approximately three years. At SRWTP, the existing flocculation and sedimentation Basins 1 and 2, old filters 1 through 16 and pump station will be replaced with new facilities. To construct these new facilities, Basin 2 and the former 911 Call Center building north of the plant will be demolished. Basin 1, pump station and old filters 1 through 16 will be decommissioned, but not demolished. As part of these proposed improvements there are associated improvements including, miscellaneous asphalt concrete roads and parking areas and pipelines. In addition, new solids handling improvements and miscellaneous electrical/process improvements will be installed to improve plant efficiency. At EAFWTP, the existing FWW basins will be retrofitted with mechanical sludge collection systems to allow regular removal of settled sludge and transfer to the solids handling facility. A new dewatering building will be constructed and fitted with equipment to dewater solids. The existing chlorine system will be expanded and other improvements to the electrical and operating system will be installed as required.

Contact Information

Name
Scott Johnson
Agency Name
City of Sacramento
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Bannon & North B Streets (SRWTP) and College Town Dr & State University Drive (EAFWTP)
Total Acres
75
Parcel #
005-0010-011, -012 and 001-0210-038, 001-0064-015, 001-0210-024, 001-0061-025
State Highways
I-5 and US 50
Schools
Cal State Sacramento
Waterways
Sacramento and American rivers

Notice of Determination

Approving Agency
City of Sacramento, City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print