19Z Diatomite Development Plan
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2011111079
- Lead Agency
- Division of Oil, Gas, and Geothermal Resources (California Division of Oil, Gas, and Geothermal Resources)
- Document Title
- 19Z Diatomite Development Plan
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/12/2012
- Present Land Use
- Extensive Agriculture, Mineral and Petroleum
- Document Description
- Project proposes activities necessary to 1) drill and test a total of 49 oil and gas wells in the Diatomite zone using cyclic steam injection and fracturing production technology, 2) convert four idles wells to be operational for steam injection, 3) construct and operate Thermally-Enhanced Oil Recovery system, 4) drill one new gas disposal well and use one existing oil/gas well for gas disposal, 5) construct and operate gathering facility, power supply and control system, and pipeline network, 6) construct and operate three 3,000 bbl emulsion gathering tanks, 7) construct and operate one 1,000 bbl drain tank, and 8) construct and operate emergency flare.
- Contact Information
-
Yuko Sakano
California Division of Oil, Gas, and Geothermal Resources
801 K Street, MS 20-20
Sacramento, CA 95814
Phone : (916) 323-0425
Location
- Counties
- Kern
- Cross Streets
- Hwy 33 Road and Reward Road
- Total Acres
- 40
- State Highways
- Hwy 33
- Railways
- No
- Airports
- No
- Schools
- McKittrick ES
- Waterways
- No
- Township
- 30S
- Range
- 22E
- Section
- 19
- Base
- MDB&M
- Other Location Info
- City/Nearest Community: McKittrick
Notice of Determination
- Approving Agency
- California Division of Oil, Gas, and Geothermal Resources
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 800 K Street, 20th Floor, Sacramento, CA 95814.
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.