Upper Narrows Pipeline Replacement Project

4 Documents in Project

Summary

SCH Number
2011111068
Lead Agency
Victor Valley Wastewater Reclamation Authority
Document Title
Upper Narrows Pipeline Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/1/2013
Present Land Use
Various (Land use designations along the pipeline alignment vary between residential, transportation, open space and flood hazard).
Document Description
The purposes of the Project at the Lewis Learning Center and the Kemper Campbell Ranch, and terminates in downtown Victorville. The Project is located at the damaged section of the Upper Narrows pipeline, at the Victor Valley Interceptor (VVI; between manholes VV4-26 through VV5-1), and the South Apple Valley Interceptor (SAVI; between manholes AV1 through AV4), in the Upper Narrows section of the Mojave River. Three staging and laydown areas (between 0.38 and 1.0 acre in size) will be located in disturbed areas near the Project construction area, including the Kemper Campbell Ranch, the Lewis Learning Center, and between C and 7th Streets.

Contact Information

Name
Christine Day
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Victorville
Counties
San Bernardino
Cross Streets
Hesperia Road and C Street
Total Acres
211
State Highways
Hwy 15
Airports
SCLA
Township
5N
Range
4W
Section
10
Base
SBB&M

Notice of Determination

Approving Agency
Victor Valley Wastewater Reclamation Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes