Upper Narrows Pipeline Replacement Project

4 Documents in Project

Summary

SCH Number
2011111068
Lead Agency
Victor Valley Wastewater Reclamation Authority
Document Title
Upper Narrows Pipeline Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
1/31/2012
Present Land Use
Various (Land use designations along the pipeline alignment vary between residential, transportation, open space and flood hazard).
Document Description
VVWRA is a regional provider of wastewater collection, treatment and reclamation services with a service area encompassing approximately 211 square miles and treating up to approximately 14 million gallons per day (MGD). VVWRA currently serves a population of approximately 350,000 people. Existing temporary sewage conveyance facilities installed since the storms of December 2010 and January 2011 are inadequate for permanent use. Therefore, action is needed to restore permanent regional wastewater conveyance facilities to replace those that were damaged during the disaster. In addition, the objective of the proposed Project is to provide greater public health safety for residents who are serviced by this sewer line, while protecting the waters of the Mojave River, community water supply, and the ecosystem from pollution caused by potential sewer ruptures during future major flooding events.

Contact Information

Name
Logan Olds
Agency Name
Victor Valley Wastewater Reclamation Authority
Contact Types
Lead/Public Agency

Location

Cities
Victorville
Counties
San Bernardino
Cross Streets
Hesperia Road and C Street
Total Acres
211
State Highways
Hwy 15
Airports
SCLA
Township
5N
Range
4W
Section
10
Base
SBB&M

Notice of Determination

Approving Agency
Victor Valley Wastewater Reclamation Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print