Formerly Used Defense Site Camp San Luis Obispo Remedial Investigation/Feasibility Study (RI/FS)
2 Documents in Project
Summary
SCH Number
2011111036
Lead Agency
California Department of Toxic Substances Control
(DTSC)
Document Title
Formerly Used Defense Site Camp San Luis Obispo Remedial Investigation/Feasibility Study (RI/FS)
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2012
Present Land Use
Recreational Agricultural
Document Description
In accordance with California Health and Safety Code, Chapter 6.8, Section 25300 et seq.. the project is the approval by DTSC of a Remedial Investigation/Feasibility Study (RI/FS) for Camp San Luis Obispo (CSLO) (June 2011) to investigate Munitions Response Site (MRS)-01, MRS-05, CSLO. Under the project, the United States Army Corps of Engineers proposes to execute the RI/FS to define target areas at MRS01, MRS-02, and MRS-05, found that are unsafe to move and need to be disposed of by detonation. If MEC are found, they will need to be disposed of by detonation. If MEC are found, they will need to be disposed of by detonation. The disposal of MEC by detonation is considered a treatment of hazardous waste. The RI/FS Work Plan is incorporated by reference.
Contact Information
Name
Ed Walker
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
Hwy 1, Dairy Creek Rd
Zip
93405
Total Acres
2549
State Highways
Hwy 1
Schools
Cuesta College, Rancho El Chorro Outdoor School
Township
30S
Range
12E
Section
000
Base
MDB&M
Notice of Determination
Approving Agency
Department of Toxic Substance Control
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.