San Diego River Multi-Use Path
2 Documents in Project
Summary
SCH Number
2011111033
Lead Agency
City of San Diego
Document Title
San Diego River Multi-Use Path
Document Type
NOD - Notice of Determination
Received
Posted
1/9/2013
Present Land Use
Open Space/Multiple Uses/OF-1-1
Document Description
SDP to allow for the construction of a new, approximately 1,200-linear-foot, 12-foot wide paved class I multi-use (bicycle and pedestrian) pathway with 2-foot wide shoulders on each side ultimately connecting to existing pathways on the east and west. The multi-use pathway would be constructed of a concrete and permeable aggregate base and includes striping, signage and lighting. Two construction staging areas would be located at both ends of the 30 foot wide construction corridor: one 30-by 50-foot area west of SR-163 within bare ground; the second approximately 20- by 30-foot area east of SR 163 within an existing developed area. Other improvements would include the construction of access ramps, retaining wall, gravity walls, kiosks, lighted bollards, peeler log fencing and the installation of a 2-foot wide, 3 inch thick layer of mulch from edge of pavement.
Contact Information
Name
Myra Hermann
Agency Name
City of San Diego
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Diego
Cross Streets
Poway Road
State Highways
SR 163
Railways
San Diego Trolley
Waterways
San Diego River
Township
16S
Range
3W
Section
23
Other Location Info
City/Nearest Community: Mission Valley
Notice of Determination
Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A