Concurrence with the Issuance of a Revised Full Solid Waste Facilities Permit for Advance Disposal Center for the Environment (Facility No. 36-AA-0337) located

3 Documents in Project

Summary

SCH Number
2011111028
Lead Agency
City of Hesperia
Document Title
Concurrence with the Issuance of a Revised Full Solid Waste Facilities Permit for Advance Disposal Center for the Environment (Facility No. 36-AA-0337) located
Document Type
NOD - Notice of Determination
Received
Posted
6/25/2012
Present Land Use
General Manufacturing
Document Description
A revised Solid Waste Facility Permit to allow the facility name change from Advance Disposal Transfer/Processing Facility to Advance Disposal Center for the Environment; increase the permitted tonnage from 600 tons per day (TPD) to 1,500 TPD; increase the permitted facility acreage from 7.0 acres to 14.48 acres; increase the permitted traffic volume from 217 vehicles per day (VPD) to 387 VPD; construction of a new receiving/processing building of approximately 64,500 square feet, and add new processing equipment and scales.

Contact Information

Name
Dianne Ohiosumua
Agency Name
CalRecycle
Contact Types
Lead/Public Agency

Location

Cities
Hesperia
Counties
San Bernardino
Cross Streets
Santa Fe Ave. x Mesa St.
Zip
92345
Total Acres
14.5
Parcel #
92345
Railways
Topeka Santa Fe RR
Schools
Mojave HS, Desert Trail
Township
4N
Range
4W
Section
10

Notice of Determination

Approving Agency
California Department of Resources Recycling and Recovery
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print