Lower Sycamore Creek Punta Gorda Street Bridge Replacement

3 Documents in Project

Summary

SCH Number
2011111020
Lead Agency
Santa Barbara, City of (City of Santa Barbara)
Document Title
Lower Sycamore Creek Punta Gorda Street Bridge Replacement
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW is intending to execute a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code (# 1600-2014-0055-R5) to the Project applicant, John Ilasin of the City of Santa Barbara. The Project proposes to build a pre-fabricated span bridge which will not impede flows. A shallow sewer pipe will be buried to a depth of 3 feet below the invert and manholes will be relocated. The following also need to be completed: Constructing of the temporary creek diversion system, bridge pile installation, constructing of bridge abutment walls, completion of grading of the top half of the creek slopes under the bridge from Station 12+50.00 to Station 13+25.00, rock slope protection under the bridge between the area of rock slope toe protection and top of slope, architectural treatments of abutment walls, and removal of the temporary creek diversion system.

Contact Information
Natasha Lohmus
CDFW
3883 Ruffin Road
San Diego, CA 92123

(805) 636-3160

Location

Cities
Santa Barbara
Counties
Santa Barbara
Cross Streets
Punta Gorda Street
Zip
93101
Total Acres
.64
Parcel #
ROW-001-603
State Highways
Hwy 101
Railways
UPRR
Airports
No
Schools
Cleveland, Franklin
Waterways
Sycamore Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
City of Santa Barbara Planning Division, 630 Garden Street, Santa Barbara, CA 93101 John Ilasin (805) 564-5383

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No