Waterford Gap Bridge Construction Streambed Alteration Agreement Notification No. 1600-2014-0071-R6
3 Documents in Project
Summary
SCH Number
2011102024
Lead Agency
City of Mammoth Lakes
Document Title
Waterford Gap Bridge Construction Streambed Alteration Agreement Notification No. 1600-2014-0071-R6
Document Type
NOD - Notice of Determination
Received
Posted
7/1/2014
Present Land Use
Along Waterford Avenue, the zoning is Residential Single Family on the east side of the road and Rural Residential on the west side of the Road. Parcels within the Mammoth Creek corridor are zoned Rural Residential and Resort; the entire creek corridor is also overlain by the Open Space Stream Corridor zoning designation. The General Plan land use designation for the residential uses along Waterford Avenue is Low Density Residential. Parcels within the Mammoth Creek corridor are zoned Resort and Open Space.
Document Description
CDFW is issuing a Streambed Alteration Agreement for the installation of a pre-fabricated 38-foot-wide, 295 foot long steel plate bridge across the Mammoth Creek channel, and the construction of two supporting abutments and two pylons within the Mammoth Creek channel (project). The project will result in permanent impacts to 0.07 acres and temporarily impacts to 0.25 acres of CDFW jurisdictional vegetated streambed and associated riparian habitat.
Contact Information
Name
Heidi Sickler
Agency Name
CA Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Location
Cities
Mammoth Lakes
Counties
Mono
Cross Streets
Waterford Avenue and Old Mammoth Road
Zip
93546
Total Acres
<1
State Highways
Hwy 203
Schools
Various
Waterways
Mammoth Creek
Township
4S
Range
27E
Section
3
Base
MDB&M
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.