Waterford Gap Bridge Construction Streambed Alteration Agreement Notification No. 1600-2014-0071-R6

3 Documents in Project

Summary

SCH Number
2011102024
Lead Agency
Mammoth Lakes, City of (City of Mammoth Lakes)
Document Title
Waterford Gap Bridge Construction Streambed Alteration Agreement Notification No. 1600-2014-0071-R6
Document Type
NOD - Notice of Determination
Received
Posted
7/1/2014
Present Land Use
Along Waterford Avenue, the zoning is Residential Single Family on the east side of the road and Rural Residential on the west side of the Road. Parcels within the Mammoth Creek corridor are zoned Rural Residential and Resort; the entire creek corridor is also overlain by the Open Space Stream Corridor zoning designation. The General Plan land use designation for the residential uses along Waterford Avenue is Low Density Residential. Parcels within the Mammoth Creek corridor are zoned Resort and Open Space.

Document Description
CDFW is issuing a Streambed Alteration Agreement for the installation of a pre-fabricated 38-foot-wide, 295 foot long steel plate bridge across the Mammoth Creek channel, and the construction of two supporting abutments and two pylons within the Mammoth Creek channel (project). The project will result in permanent impacts to 0.07 acres and temporarily impacts to 0.25 acres of CDFW jurisdictional vegetated streambed and associated riparian habitat.

Contact Information
Heidi Sickler
CA Department of Fish and Wildlife
Inland Deserts Region 6 3602 Inland Empire Boulevard, Suite C-220
Ontario, CA 91764

Phone : (760) 872-0751

Location

Cities
Mammoth Lakes
Counties
Mono
Cross Streets
Waterford Avenue and Old Mammoth Road
Zip
93546
Total Acres
<1
State Highways
Hwy 203
Schools
Various
Waterways
Mammoth Creek
Township
4S
Range
27E
Section
3
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Town of Mammoth Lakes

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search