New York Trail East Project (aka SMUD Trail Project CIP #97005)
5 Documents in Project
Summary
SCH Number
2011102001
Lead Agency
El Dorado County
Document Title
New York Trail East Project (aka SMUD Trail Project CIP #97005)
Document Type
NOD - Notice of Determination
Received
Posted
7/17/2012
Present Land Use
Open Space; Recreational Facility/One-Family Residential
Document Description
The Project proposes to construct an 8-foot-wide paved, multi-use trail with 4-foot-wide gravel shoulders, approximately 1,800 feet long. Pending final design, the trail may alternatively have a 6-foot-wide gravel shoulders, approximately 1,800 feet long. Pending final design, the trail may alternatively have a 6-foot wide gravel shoulder on one side to accommodate equestrians, but the total trail width would still be 16 feet. The trail would begin at Silva Valley Parkway and generally parallel and existing dirt path westward between the power lines to a proposed new, prefabricated bridge crossing at New York Creek, and terminate at Tam O'Shanter Drive.
Contact Information
Name
Kandra Hester-Del Bianco
Agency Name
California Transportation Commission
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
El Dorado
Cross Streets
North of Tam O'Shanter and Brookline Circle
Zip
95768
Total Acres
9.1
Parcel #
125-100-01, 06
Waterways
New York Creek
Township
10N
Range
8E
Section
26, 27
Base
MDB&M
Other Location Info
City/Nearest Community: El Dorado Hills
Notice of Determination
Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.