New York Trail East Project (aka SMUD Trail Project CIP #97005)

5 Documents in Project

Summary

SCH Number
2011102001
Lead Agency
El Dorado County
Document Title
New York Trail East Project (aka SMUD Trail Project CIP #97005)
Document Type
NOD - Notice of Determination
Received
Posted
2/3/2012
Present Land Use
Open Space; Recreational Facility/One-Family Residential
Document Description
The El Dorado County Department of Transportation is proposing to install a multi-use trail in El Dorado Hills along a power line corridor maintained by the Sacramento Municipal Utility District and Pacific Gas and Electric Company between Silva Valley Parkway and Tam O'Shanter Drive. The project area or area of potential effects encompasses the 300-foot-wide corridor between two developments (approximately 11 acres) and is bounded on the east by Silva Valley Parkway and on the west by Tam O'Shanter Drive, which forms the eastern boundary of Stephen Harris Park. The trail would be a paved, 8-foot-wide trail with a 4-foot-wide gravel shoulder; it would be approximately 1,800 feet long. The alignment would generally parallel an existing dirt path between the power lines, and a prefabricated bridge would be installed across New York Creek.

Contact Information

Name
Janet Postlewait
Agency Name
El Dorado County Department of Transportation
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
North of Tam O'Shanter and Brookline Circle
Zip
95768
Total Acres
9.1
Parcel #
125-100-01, 06
Waterways
New York Creek
Township
10N
Range
8E
Section
26, 27
Base
MDB&M
Other Location Info
City/Nearest Community: El Dorado Hills

Notice of Determination

Approving Agency
El Dorado County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print