The Skate Park Project (Site Plan Review No. 12-003, Conditional Use Permit No. 12-009, Variance No. 12-004)
4 Documents in Project
Summary
SCH Number
2011101064
Lead Agency
City of Huntington Beach
Document Title
The Skate Park Project (Site Plan Review No. 12-003, Conditional Use Permit No. 12-009, Variance No. 12-004)
Document Type
NOD - Notice of Determination
Received
Posted
12/7/2012
Present Land Use
GP: Mixed-Use with both a Specific Plan Overlay and a Design Overlay (M-sp-d)
Z: Beach and Edinger Corridors Specific Plan (Town Center - Neighborhood)
Document Description
To 1) permit the development of a skate park consisting of a 14,500 sq. ft. skate park plaza, a 11,800 sq. ft, skate bowl area, a 3,500 sq. ft. skate shop/concession/restroom building, a 185 sq. ft. restroom structure, anda 150 sq. ft. entrance kiosk; 2) permit the on-site reduction of required parking and to permit off-site parking at the Huntingtons in the distrance of joint use parking during special events, driveway width, driveway setback, parking lot landscaping screening, frontage street lighting, and frontage coverage.
Contact Information
Name
Tess Nguyen
Agency Name
City of Huntington Beach
Contact Types
Lead/Public Agency
Phone
Location
Cities
Huntington Beach
Counties
Orange
Cross Streets
Center Avenue at Gothard Street
Zip
92647
Total Acres
2.718
Parcel #
142-073-03
State Highways
I-405, SR 39
Railways
Pacific Electric ROW
Schools
Multiple schools
Township
5
Range
11
Section
14
Notice of Determination
Approving Agency
City of Huntington Beach Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.