Center Avenue Skate Park Project
4 Documents in Project
Summary
SCH Number
2011101064
Lead Agency
City of Huntington Beach
Document Title
Center Avenue Skate Park Project
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
GP: Mixed-Use with both a Specific Plan Overlay and a Design Overlay (M-sp-d)
Z: Beach and Edinger Corridors Specific Plan (Town Center - Neighborhood)
Document Description
The project applicant proposes to lease vacant property from the City to design, develop, maintain and operate a public skate park. The proposed project includes ~14,000 sf of skate park plaza area, 13,000 sf of skate bowl area, a 3,500 sf skate shop/concession/restroom building, 15,000 sf of turf/walking area, a 480 sf skate park restroom structure, a 200 sf skate park entrance kiosk, the main parking lot near the primary site access fronting Center Ave, and a secondary parking area off McFadden Ave to be used only for special events.
Contact Information
Name
Tess Nguyen
Agency Name
City of Huntington Beach
Contact Types
Lead/Public Agency
Phone
Location
Cities
Huntington Beach
Counties
Orange
Cross Streets
Center Avenue at Gothard Street
Zip
92647
Total Acres
2.718
Parcel #
142-073-03
State Highways
I-405, SR 39
Railways
Pacific Electric ROW
Schools
Multiple schools
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 12 (DOT), California Highway Patrol, California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), Department of Water Resources, Office of Historic Preservation, Resources Agency, California Native American Heritage Commission (NAHC), Department of Toxic Substances Control
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), Department of Toxic Substances Control
Development Types
Commercial (Sq. Ft. 3,500), Recreational (Skate Park)
Local Actions
General Plan Amendment, Site Plan, Rezone, Variance
Project Issues
Aesthetics, Air Quality, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Recreation, Transportation
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.