South Palm Canyon Drive Low Water Crossing Bridge Replacement at Arenas Canyon South

2 Documents in Project

Summary

SCH Number
2011101060
Lead Agency
Palm Springs, City of (City of Palm Springs)
Document Title
South Palm Canyon Drive Low Water Crossing Bridge Replacement at Arenas Canyon South
Document Type
NOD - Notice of Determination
Received
Posted
1/23/2012
Present Land Use
Water course zone hazard, Single family Residential Zones, Limited Multiple Zone, and Watercourse

Document Description
The City of Palm Springs proposes to replace the existing low-water crossing on South Palm Canyon Drive at Arenas Canyon South with a four-lane bridge structure to provide all-weather access. Currently, access is disrupted on South Palm Canyon Drive during storm events due to flooding. Storm runoff would be directed through the new structure and the existing Arenas Canyon South tributary would be excavated and channelized. Levees will be constructed along the new channelized alignment of the Arenas Canyon South tributary from South Palm Canyon Drive to the west.

Contact Information
Marcus Fuller
City of Palm Springs
3200 E. Tahquitz Canyon Way
Palm Springs, CA 92262

Phone : 760 323 8253 x8744

Location

Coordinates
33°46'40.7"N 116°33'1.4"W
Cities
Palm Springs
Counties
Riverside
Cross Streets
South Palm Canyon Drive and Bogert Trail
Zip
92264
Parcel #
513-460-033
Schools
Cahuilla & Smoke Tree
Waterways
Arenas Canyon South tributary
Township
4S
Range
4E
Section
34,35

Notice of Determination

Approving Agency
City of Palm Springs
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
City of Palm Springs, 3200 E. Tahquitz Canyon Way, Palm Springs, CA 92262

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print