Merced South 115 kV South Transmission Line and Substation Project

6 Documents in Project

Summary

SCH Number
2011101024
Lead Agency
Merced Irrigation District
Document Title
Merced South 115 kV South Transmission Line and Substation Project
Document Type
FIN - Final Document
Received
Present Land Use
Merced County: Ag /A-1 (Transmission line); City of Merced: Manufacturing industrial/I-H (substation)
Document Description
FYI: Final MID plans to build approximately 13.1 miles of double-circuit 115 kV transmission lines with double circuit 21 kV underbuild and a 115-21 kV substation to connect the existing MID 115 kV lines on SR 99 west of the City to a new substation in the planned commercial and industrial area in the southeastern corner of the City of Merced. The proposed route would follow Franklin Rd south to Rice Rd, turn east and follow Belly Rd, cross SR 99, follow McHenry Rd, turn north, and run along property lines to the substation site on Mission Ave. The project also include undergrounding overhead PG&E distribution lines where they conflict with the MID facilities, raising PG&E 230 kV and 115 kV lattice steel towers near Mission Ave to provide clearance for the MID transmission lines, and undergrounding MID 21 kV lines where crossing PG&E transmission lines.

Contact Information

Name
Don Ouchley
Agency Name
Merced Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Madera, Merced
Counties
Merced
Cross Streets
Substation: Mission Ave, between Coffee Ave and Orchard Dr
Zip
95341
Total Acres
83
Parcel #
069-290-052
State Highways
Hwy 59, 99, 140
Railways
Union Pacific
Airports
Merced Municipal
Schools
Franklin Pre&ES,Joe Stefani ES,Golden State Truck,
Waterways
Creeks: Black Rascal, Bear, Owens, Miles, Mariposa; Sloughs: South, Hartley's, Snake, duck;
Other Information
schools cont.: Central Valley Christian, Buhacn Grammar, McSwain ES, Bear Country Pre, Central Valley Traning Center, Valley Community, Reyes Pre & ES, Farmdale ES, Pioneer ES, Weaver MS, KinderCare Learning Center

Notice of Completion

State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 10 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Caltrans, Division of Aeronautics, Department of Water Resources, Resources Agency
Development Types
Other (115/21 kV Substation, 115 kV transmission)
Local Actions
Irrigation Electric
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Greenhouse Gases

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print