Household Hazardous Waste Transfer Facility Project

Summary

SCH Number
2011099017
Lead Agency
City of Elk Grove
Document Title
Household Hazardous Waste Transfer Facility Project
Document Type
NOD - Notice of Determination
Received
Posted
9/30/2011
Document Description
The CA DFG is executing Lake or Streambed Alteration Agreement number 1600-2011-0125-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, City of Elk Grove. The HHWCF access road requires the construction of a crossing over the Grant Line Channel. The Grant Line Channel is an ~50 foot wide (top of slope to top of slope), naturally lined, intermittently flowing drainage channel that was determined to be a jurisdictional water of the United States in 2007 (SPK-2007-01014). The Grant Line Channel crosses under existing Grant Line Road via dual 66-inch culverts and continues to flow south and east through the project limits, ultimately out-falling to Deer Creek. The project includes construction of 1,300 linear feet of roadway with dual 60-inch box culverts at the Grant Line Channel. The roadway embankment slopes at the channel crossing will be 2:1 (horizontal: vertical) or flatter.

Contact Information

Name
Sandra Jacks
Agency Name
DFG
Contact Types
Lead/Public Agency

Location

Counties
Sacramento

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print