Pride THP (2-09-094-SIE)

Summary

SCH Number
2011099016
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Pride THP (2-09-094-SIE)
Document Type
NOD - Notice of Determination
Received
Posted
9/30/2011
Document Description
The CA DFG is executing Lake or Streambed Alteration Agreement number 1600-2011-0106-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Sierra Pacific Industries. The project is limited to: replacement of a failed Humboldt Crossing with a 42" CMP on a class II watercourse (#07-2); installation of a new 18" CMP on a spring at an existing road crossing (#07-3); installation and removal of temporary skid trail "spittler" crossing on a spring-fed class II watercourse (#07-5); construction of a waterhole on a spring fed intermittent class II watercourse (Waterhole C); removal of debris and sediment creating a diversion dam on a call III watercourse immediately below a spring, tributary to Deer Creek (#07-4); and, construction of a waterhole on a spring fed class II watercourse (Waterhole C). Equipment to be used may include an excavator, backhoe, bulldozer, dump truck, skidder, grader, and/or water truck.

Contact Information

Name
Julie C. Newman
Agency Name
DFG
Contact Types
Lead/Public Agency

Location

Counties
Sierra

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes