South Steiner Pumps and Pipeline Project

2 Documents in Project

Summary

SCH Number
2011092075
Lead Agency
Reclamation District No. 108
Document Title
South Steiner Pumps and Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
11/2/2011
Present Land Use
AG and E-A
Document Description
Reclamation District 108 proposes to abandon in place the South Steiner Pumping Plant (SSPP) on the Sacramento River after constructing a 2,830 foot pipeline and related facilities to redirect irrigation water pumped from the Wilkins Slough Pumping Plant and Fish Screen Facility (also on the Sacramento River) to fields previously served by the SSPP. This action is required due to ongoing siltation caused by recent U.S. Army Corps of Engineers work on a critical erosion site in the area. The proposed action includes two primary components: 1) installation of pump sumps; and 2) construction of a dual 21-inch, 2,830 foot-long PVC pipeline.

Contact Information

Name
Lewis Bair
Agency Name
Reclamation District No. 108
Contact Types
Lead/Public Agency

Location

Counties
Colusa
Cross Streets
located between Wilson bend Road and the Sacramento River
Zip
95950
Total Acres
3.8
State Highways
Hwy 45
Waterways
Sacramento River
Township
14N
Range
1E
Section
11, 12
Other Location Info
City/Nearest Community: Grimes

Notice of Determination

Approving Agency
Reclamation District 108
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print