RE McKenzie Road Solar Facility Use Permit and Special Development Permit

2 Documents in Project

Summary

SCH Number
2011092064
Lead Agency
Sacramento County
Document Title
RE McKenzie Road Solar Facility Use Permit and Special Development Permit
Document Type
NOD - Notice of Determination
Received
Posted
10/31/2011
Present Land Use
Agricultural fields/AG-80 and AG-20/General Agriculture 80 and 20
Document Description
1. A Use permit to allow a 30-megawatt solar facility consisting of ground-mounted photovoltaic solar modular array panel blocks on 239 acres of an approximately 405.23 net-acre site in the AG-20 and AG-80 (Agricultural) and AG-20 (F) and Ag-80 (F) (Flood Combining) zones. 2. A Use Permit to allow an approximately 6-foot-high chain link fence topped with three-strand barbed wire, totaling approximately 7 feet high. The fence will surround the proposed solar facility on all sides. The proposed fence deviates from the 6-foot height requirement for Agricultural zones (Zoning Code Section 305-83.2(3)). 3. A Special Development Permit to allow the internal access aisles to be dirt rather than constructed with a dust-free surface.

Contact Information

Name
Catherine Hack
Agency Name
Sacramento County, Community Planning & Development
Contact Types
Lead/Public Agency

Location

Cities
Galt
Counties
Sacramento
Cross Streets
McKenzie/Mingo
Total Acres
290
Parcel #
148-0020-030; 148-0051-062 and -063
State Highways
Hwy 99
Railways
No
Airports
No
Schools
Liberty Ranch HS
Waterways
Skunk Creek and Laguna

Notice of Determination

Approving Agency
County of Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print