San Jose Water Company Saratoga Hills Station Tanks Replacement Project

2 Documents in Project

Summary

SCH Number
2011092044
Lead Agency
California Department of Public Health (CDPH)
Document Title
San Jose Water Company Saratoga Hills Station Tanks Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/12/2011
Present Land Use
Residential (R140)
Document Description
The San Jose Water Company proposes to replace the Saratoga Hills Tanks located off Saratoga Hills and Pike Roads. The two existing 1.0 million gallon tanks will be replaced with two 1.4 million gallon tanks. The current tanks are approximately 110 feet in diameter and 17 feet in height. The new tanks will encompass approximately the same footprints but will be 29.5 feet in height. The proposed project would be completed in two phases; Phase 1 would include extensive tree removal, demolition of the existing Tank 1, construction of a new retaining wall and construction of the proposed new Tank 1. A temporary access road would also be constructed. Phase 2 would include demolition of the existing Tank 2, construction of the proposed new Tank 2, widening of the existing service road, construction of a new retaining wall and re-vegetation of the project site.

Contact Information

Name
Kelvin Yamada
Agency Name
California Department of Public Health
Contact Types
Lead/Public Agency

Location

Cities
Saratoga
Counties
Santa Clara
Cross Streets
Pike Road
Parcel #
503-29-011
Township
8S
Range
2W
Section
2
Base
MDB&M

Notice of Determination

Approving Agency
CA Department of Public Health
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.