California Maritime Academy, Physical Education and Pool Facility, Schematic Plan Approval

2 Documents in Project

Summary

SCH Number
2011092031
Lead Agency
California State University, Long Beach (CSULB)
Document Title
California Maritime Academy, Physical Education and Pool Facility, Schematic Plan Approval
Document Type
NOD - Notice of Determination
Received
Posted
11/17/2011
Present Land Use
PLU: Vacant Z: Planned Development Residential GP: Residential High Density
Document Description
The new physical education building and outdoor training pool on the currently vacant site would replace the existing Gymnasium and Natatorium located at the main campus. The new two story physical education building would be approximately 37,180 gross s.f. in size and the gymnasium would provide a max seating capacity for up to 650 persons. The outdoor area would be located at the center of the site and would consists of a 50-meter by 25-yard competition and aquatics survival training pool with a maximum seating capacity of 500. Lighting would be provided on site for both nighttime activities and security purposes. Large scale signage and graphics may also be located in front of the building and would be visible to the I-80 corridor. Ingress and egress would be provided by two access points on Maritime Academy Drive. Approximately 95 parking spaces would be provided to serve the new facilities, with an additional 85 spaces to be developed as a future campus project. Construction of the new facility is part of the CA Maritime Academy Master Plan program (May 2002) and evaluated in an EIR certified in 2002 as a State-funded capital outlay project.

Contact Information

Name
Stephanie Giordano
Agency Name
California State University, Long Beach
Contact Types
Lead/Public Agency

Location

Cities
Vallejo
Counties
Solano
Cross Streets
Maritime Academy Drive and Country Lane Drive
Zip
94590
Total Acres
~6
State Highways
I-80
Schools
CA Maritime Academy
Waterways
San Pablo Bay

Notice of Determination

Approving Agency
California State University Trustees
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print