Harris Canyon Creek Crossing Improvement

9 Documents in Project

Summary

SCH Number
2011091085
Lead Agency
Santa Barbara County
Document Title
Harris Canyon Creek Crossing Improvement
Document Type
NOD - Notice of Determination
Received
Posted
6/26/2014
Present Land Use
Agriculture, oil and gas production
Document Description
DFW is intending to execute a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code (# 1600-2013-0297-R5) to the project applicant, Laurie Tamura of Santa Maria Energy LLC. The project proposes to replace two existing culvert crossings on an intermittent stream to expand the roads from a single lane to 36 feet wide at the top, 50 feet wide at the base, to provide passage for two vehicles. The road elevation will be raised to accommodate a single 72-inch corrugated metal culvert to replace two small culverts at each site. A concrete trench will be installed adjacent to the road surface, on the shoulder, to be used as a protective vault for pipelines. Native rock will be used for energy dissipation and to line the slopes of the crossing. Native vegetation will be planted to replace existing ruderal non-native vegetation and native oaks will be planted within the property to mitigate for the loss of 5 oaks. The area is a working oil and gas extraction field and contains a facility and several wells.

Contact Information

Name
Natasha Lohmus
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Santa Maria
Counties
Santa Barbara
Cross Streets
Graciosa Rd and Hwy 135
Zip
93455
Total Acres
32
Parcel #
101-020-174
State Highways
Hwy 1 and 135
Railways
No
Airports
Santa Maria
Schools
St. Joseph HS, Santa Maria Joint Union HSD, Orcutt Union SD
Waterways
Orcutt and San Antonio Creeks
Township
8N
Range
34W
Section
3
Base
SBB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print