Shaver Lake Dam Geomembrane Liner Project

3 Documents in Project

Summary

SCH Number
2011091068
Lead Agency
Fish & Game #4
Document Title
Shaver Lake Dam Geomembrane Liner Project
Document Type
NOD - Notice of Determination
Received
Posted
11/17/2011
Present Land Use
Public Facility

Document Description
The California Department of Fish and Game, as Lead Agency, is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game has noticed increased water seepage through Shaver Dam. In order to reduce seepage and protect the upstream face of the dam from the elements, SCE is applying a PVC geomembrane liner. The liner should protect the upstream face of the dam from weathering and reduce the seepage, thus extending the life of the dam. Attaching the liner to the dam will require a drawdown of the lake level to Shaver Lake. The California Department of Fish and Game has determined is subject to regulation pursuant to Fish and Game Code Section 1600 et. seq.

Contact Information
Annette Tenneboe
California Department of Fish and Game
Lead/Public Agency
Central Region 1234 E. Shaw Avenue
Fresno, CA 93710

Phone : 559 243 4014 x.231

Location

Coordinates
37°8'39.5"N 119°18'10.3"W
Counties
Fresno
State Highways
Hwy 168
Waterways
Shaver Lake - Stevenson Creek
Township
9S
Range
24E
Section
13
Base
MDB&M
Other Location Info
City/Nearest Community: Shaver Lake

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
N/A

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print