Glenarm Power Plant Repowering Project

3 Documents in Project

Summary

SCH Number
2011091056
Lead Agency
City of Pasadena
Document Title
Glenarm Power Plant Repowering Project
Document Type
NOD - Notice of Determination
Received
Posted
4/10/2013
Present Land Use
Municipal Power Plant/IG SP-2, HL "56" /SP-2 Overlay District
Document Description
The Project includes the installation of a new 71-MW combined-cycle power-generating unit (GT-5) to replace existing steam-generating Unit B-3; construction of a 3,850 sq. ft. modular building housing a control room near the western perimeter of the Glenarm Plant Site; construction of a 10-foot wall along the Fair Oaks property line; demolition of the existing Glenarm Building stack and ductwork and two small building additions; closure of the State St. cul-de-sac and installation of a 10-foot gate; incorporation of a one-acre parcel south of State St.; remodel and expansion of the existing 4,000 square-foot Pump Building on this parcel; and landscaping along Fair Oaks Ave. and Arroyo Parkway.

Contact Information

Name
Rober Avila
Agency Name
Pasadena Water & Power Department
Contact Types
Lead/Public Agency

Location

Cities
Pasadena
Counties
Los Angeles
Cross Streets
Glenarm Street and State Street
Zip
91105
Total Acres
6.52
Parcel #
5317-030-901, -902; 5317-029-900
State Highways
SR 110
Railways
Metro Gold Line
Schools
Blair HS, Allendale ES
Waterways
Arroyo Seco

Notice of Determination

Approving Agency
City of Pasadena
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print